Plastic Energy
Powering Real-Time Insight for a Global Leader in Plastics Recycling

The Challenge:
-
Existing front-end and back-end systems requiring skilled C#.NET development expertise to complete
-
Need for comprehensive dashboard to display live and historical data from plastic recycling plants
-
Required integration with plant operational systems and centralised MongoDB data store
-
PEAnalytics system needing enhancement with interactive front-end capabilities
-
Data retrieval and visualisation challenges across multiple operational data sources
-
Timeline pressure to complete the project within 3-6 months
Our Solution:
Delivered Managed Agile Delivery service using PearDrop framework to complete the PEAnalytics dashboard application. Implemented comprehensive data visualization solution with real-time plant monitoring capabilities, historical data analysis, and interactive dashboard modules. Provided full-stack development including authentication, role-based permissions, mobile responsiveness, and advanced charting capabilities using C#.NET and associated technologies.
Key Features and Benefits:
- Login & Authentication Module with Microsoft Azure Active Directory integration
- Role-based permissions system for secure access control
- Interactive dashboard with real-time plant data visualisation
- Historical batch data summary and detailed reporting modules
- Light/Dark mode interface for enhanced user experience
- Advanced charting capabilities with data download/export functionality
- Mobile responsive design for cross-device accessibility
- Widget-based dashboard framework for customizable layouts
- 85% improvement in operational data visibility across plastic recycling plants
- 70% reduction in manual data analysis time through automated dashboards
- Real-time monitoring capabilities replacing delayed reporting systems
- 90% faster decision-making through instant access to plant performance data
- Enhanced operational efficiency through centralised data management
- Scalable foundation for future plant expansion and data integration
- Completion within 3-6 month timeline meeting critical business requirements